an IBF brand Slats Installation of Concrete Slats In new buildings the installation of the slats from SundsAlfa can be carried out simply and easily. All slats are mostly delivered packed on pallets with 3” x 3” sticks between each layer*. As well as all slats are stacked on the pallets as they have to be installed in the stables (all slats are delivered with the upside up). The installation of the slats can therefore be done easily and with help by ex a building crane. The slats can be taken directly from the vehicle and quickly and easy be installed into in the buildings, without the already installed slats will be subjected to heavy loads. In existing buildings the installation can be done easily by use with a forklift. Because of the space between each layer it’s possible to transport every slat/layer with a forklift from the pallet to the barn without manually lifting the slats. The forklift can even install the slats directly into place as long as you can drive between the channel walling. Using either a building crane, forklift or. makes the installation more gentle to the slats (avoid risks of handling scratches), do the job more easy, efficient and gentle to the labour. * To countries overseas we’ll pack the slats with less space between each layer to optimize the cost of freight.